GROWING TOGETHER
Over the next few months we will be working on a number of projects here at the park. Many of these projects
will be on the playing field, some will be infrastructure that might not be visible to players, but hopefully will improve
the entire experience from check-in to departure.
To accelerate the rate of improvements and to allow our friends to participate in the process we will post
on this page various materials and equipment that could be used to make improvements. If you happen to have access to any
of these items (large or small) they will be put to good use in improving the park. If you don't have a way to get something
to the park, we will work on arrangements for transportation.
All
of the owners have other jobs, so we can't work on park projects every day. But, we will send out an e-mail and post
it on the calendar when we schedule a workday so if any of you have some free time you can come out and work with us
for a few hours. It's a great way to get to know each other better and to have input on future park plans. Please send us
an e-mail if you think you might be able to come out on one of the posted days so we'll know you're coming. (Lunch and
drinks will be provided.)
Equipment & Material list:
Use of Bulldozer or Bobcat for a few hours or days
Railroad
ties
Use of Trenching machine
for drainage pipe
Framing
lumber- Two-by-twos, two-by-fours, two-by-sixes, etc., etc., etc.
Plywood all types
Used
stockade fence panels
Landscape
timbers, pressure treated 4x4's
Gravel
Sand
Portland cement
Ready-mix concrete
Mortar mix
Bricks and blocks
Reinforcing rods (rebar) all sizes
Wire mesh for concrete
Wire lathe for plaster
Angle iron, I-beams, and C-channel
Paint
Concrete culverts
PVC drainage pipe
Steel cable-3/8 to 1/2
Poly rope 3/8 to 1/2"
Outdoor tables